Ransomware attackers specifically target and attempt to destroy backup systems to increase the probability of payment. Hardening your system is critical. Please ensure you have reviewed your platform security using the Security Hardening Checklist
AI

Welcome to Cohesity Documentation.

Ask me anything — from configuration steps and architecture overviews to troubleshooting, feature details, and release notes.


AI may make mistakes. Always verify critical information.

Cohesity

COHESITY Documentation

Explore our documentation to get started, discover products & new features, access troubleshooting guides, register sources, platforms support.

Products
Data Security Alliance
Visit Cohesity.com
Demos
Support
Blogs
Developers
Partner Portals
Cohesity Community
© 2026 Cohesity, Inc. All Rights Reserved.
Terms of Use|
Privacy Policy|
Legal|
  1. Home
  2. NetBackup™ Access 3360 Appliance Hardware Installation Guide
  3. Hardware installation procedures
  4. Turning on the hardware and verifying operation
NetBackup™ Access 3360 Appliance Hardware Installation Guide

Turning on the hardware and verifying operation

The hardware components must be turned on in a specific sequence to ensure correct communication between them.

You must turn on the hardware in the following order:

  • Expansion shelf

    Note:

    If there are multiple expansion shelves, you are required to power on the last shelf in the chain first and work back toward the head unit.

  • Primary shelf

  • Compute nodes

To turn on the hardware

  1. Verify that the following cables are connected properly and securely:
    • Ethernet cables between two nodes.

    • SAS-3 cables between the compute nodes and the Primary Shelf.

    • SAS cables between the Primary Shelf and the Expansion Shelf.

    • SAS cables between the Expansion shelves (if installed).

    • Power cords from each component to the appropriate Power Distribution Unit (PDU) sockets in the rack.

  2. On the rear panel of the Expansion shelf that is farthest from the compute node, turn on both power supplies.
  3. Wait 2 or 3 minutes for the shelf to initialize. The shelf is more quiet when it has initialized.
  4. Verify that the Power OK LEDs on both power supplies are green.

    Number

    Description

    1

    Power supply failure

    2

    AC failure

    3

    Power OK

  5. Verify that the Power on (standby) LED on the front, left, of the shelf is green.
  6. Turn on the next Expansion shelf and let it initialize.
    • Verify that the Power OK LEDs on the power supply modules are green.

    • Verify that the Power On LED on the control panel on the front of the shelf is green.

  7. If you have three Expansion shelves, turn on the third shelf.
    • Verify that the Power OK LEDs on the power supply modules are green.

    • Verify that the Power On LED on the control panel on the front of the shelf is green.

  8. Turn on the Primary Storage Shelf.

    • Let the shelf initialize for 2 or 3 minutes.

    • Verify that the Power OK LEDs on the power supply modules are green.

    • Verify that the Power On LED on the control panel on the front of the shelf is green.

  9. Turn on the compute node with the power button on the front right side.

    Verify that the LED under the button is green.

Feedback

Was this page helpful?
Previous
Connecting the power cords to the hardware
Next
Configuring the IPMI port

Feedback

Was this page helpful?